SSP
PVT LIMITED has developed an evaporator, where no condenser, a spray pond &
a cooling tower is required. This technology will save lot of energy and
shall also save cost in terms of recurring expenditure & infrastructure.



| MILK POWDER PLANT (SMP)- CAPACITY 1 TPH POWDER OUTPUT | ||
| EVAPORATOR | ||
| EVAPORATOR FEED RATE | 12,936 | KG/HR |
| INITIAL TOTAL SOLIDS | 7.5 | % |
| FINAL SOLIDS | 45 | % |
| CONCENTRATE OUTPUT | 2156 | KG/HR |
| WATER EVAPORATION | 10,780 | KG/HR |
| DRYER | ||
| FEED RATE | 2156 | KG/HR |
| INITIAL SOLIDS | 45 | % |
| FINAL MOISTURE IN POWDER | 3 | % |
| POWDER OUTPUT | 1000 | KG/HR |
| Utility Comparisons | ||
| DETAILS | 5 Effect Evaporator (Conventional) | 6 Effect Evaporator (Modified) |
| Water Evaporation (kg/hr) | 10,780 | 10,780 |
| Steam Consumption at TVR (kg/hr) | 1600 | 1263 |
| Cooling Water circulation for Condenser (m3/hr) | 80 | Nil |
| Power | ||
| For Main Plant | 45 | 45 |
| For Cooling tower and cooling water pump | 20 | Nil |
| Total Power (kW) | 65 | 45 |
| UTILITY COMPARISONS | SAVINGS IN NEW DESIGN (6 Effect without Condenser) over Conventional (5 Effect Evaporator with Condenser) | |||
| DETAILS | 5 Effect Evaporator (Conventional) | 6 Effect Evaporator (Modified) | Saving (Per hour) | Savings (per Annum) : 20 hours a day and 300 days an annum |
| Water Evaporation (kg/hr) | 10,780 | 10,780 | - | - |
| Steam Consumption at TVR (kg/hr) | 1600 | 1263 | 337 | * US $ 45,000 |
| Power (kW) | 65 | 45 | 20 | * US $ 12,000 |
| Total Savings per annum | - | - | - | * US $ 57,000 |